TypeBusiness Units · Industrial Design & Build · Light Industrial units
TenureFor sale or rent
A26 Lewes is an exciting regeneration project providing a mixed-use development with consent for flexible business space units fronting the main A26 with a new housing development to the rear of the site. It will offer rarely available new Business Units, with prime road frontage, which can be designed with your business in mind. Its an ideal environment for your business to flourish on a new business campus with custom designed units from 1,400sqft -20,000sqft.
Specification key features:
6m internal eaves height
15 kN/m ground floor loading capacity
3 phase electricity, mains water and telecoms ducting will be available
Electric roller shutter loading doors
High quality micro-rib cladding systems to roofs and walls
10% daylight roof panels
First floor suitable for office fit-out (subject to necessary consents)
Allocated parking spaces
24 hour access
The developer reserves the right to vary the specification through the build process, subject to design and regulation requirements.
The site benefits from prime main road frontage of approximately 250m along the main A26 between Lewes and Uckfield. The site is located directly opposite the Clayhill Service Station and Convenience Store and is situated 2.5 miles directly north of Lewes and 1.5 miles east of the village of Ringmer which offers a wide range of local services.
Ringmer sits between the County Town of Lewes to the south and Uckfield to the north whilst being equidistant from Brighton, Eastbourne and Newhaven Port. Transport links are excellent via the A26, A27, A22 & greater road networks. Lewes also benefits from excellent public transport links with comprehensive bus services which utilise the A26 between Uckfield and Lewes (route 28/29) with three bus stops outside the development. Lewes mainline railway station offers frequent services to London Victoria (64 minutes), Brighton (14 minutes) and Gatwick (34 minutes). Uckfield to the north also has services to London Bridge.
Phase 1 planning approved and has started on site
Ready for occupation Q3 2025
Can accommodate a single unit up to 20,000sqft
Custom design options available for Phase 2 (STP)