Share

End of terrace industrial unit of steel portal frame construction arranged over two floors with profile clad elevations and roof which incorporates translucent daylight panels. Internally, the unit has been fitted with a large mezzanine level containing fully fitted office accommodation. The warehouse is accessed via an electric loading door and benefits from an eaves height of 5.8m. The building is arranged as workshop and storage to the ground floor with separate office space. Additionally, WC and shower facilities are available on the ground floor. The first floor consists fully fitted office space with LED lighting and perimeter trunking, benefitting from a large meeting room and kitchenette. The roof also benefits from having photovoltaic panels installed, providing an additional income and saving on electricity costs. Further details available. Externally, there are car parking spaces and loading area immediately to the front of the building.