Share

The premises comprise three light industrial/ workshop units with good access, yard and parking areas. The largest of the three buildings is of solid brick / block construction under a steel framed
profiled metal pitched roof and is currently arranged to provide an open plan workshop area
together with offices, a meeting room, kitchen and toilets.
A substantial modern extension of steel portal frame construction under a pitched roof andclad
with insulated profiled metal sheeting was added about 4 years ago. This new building
incorporates a mezzanine storage area and a full height loading door. Planning consent has been granted to extend this building.
There is also a further storage building behind these main buildings. The site benefits from 3-
Phase electricity. Heating and hot water to the offices is via an oil fired boiler. Foul drainage is
to a septic tank situated on the site.